HCIP-Transmission V2.0 Certification H31-341 Updated Exam Questions

HCIP-Transmission V2.0 Certification H31-341 Updated Exam Questions

HCIP-Transmission V2.0 is the current version which test your ability to commission, configure, maintain, perform tests on Huawei transmission equipment, and handle common faults. H31-341 exam questions are updated by ITExamShop team to help you learn all the Q&As and pass HCIP-Transmission V2.0 certification exam successfully. Starting at reading H31-341 updated exam questions helps candidates prepare for HCIP-Transmission V2.0 H31-341 exam well, the great team ensure that you can pass HCIP-Transmission V2.0 certification exam successfully.

HCIP-Transmission V2.0 H31-341 Free Questions Are Also Online For Checking

Page 1 of 4

1. In the extended SSM ring network dual BITS clock protection scenario, in order to prevent the clock signal from forming a loop, you only need to configure the external clock source and internal clock source ID of the network element connected to the active BITS, and the network element connected to the standby BITS does not need to configure the internal clock ID.

2. Regarding the description of replacing the main control board, which is wrong?

3. When a signal with a standard Ethernet frame length of 64 Bytes is connected to the Ethernet board, if the QinQ function is enabled, what is the actual frame length of the signal inside the board?

4. When performing fiber synchronization, the network element does not create a fiber representation?

5. Which layer of the TCP/UDP protocol is located in the TCP/IP protocol?

6. The maximum output optical power of an optical amplifier OBU is 20 dBm, and when it is used in the C-band 80 passive system, how much dBm should the single-wave standard output optical power be?

7. In the characteristic test of the splitter (combiner), what standard is required for the isolation test?

8. The following description about ODUk ring network protection, which is wrong?

9. The following description about the signal flow of the OTM site (OSN 8800 equipment), which is wrong?

10. "Loopback method" includes the following four steps: 1. Loopback business channel sampling; 2. Draw a business path diagram; 3. Loopback section by section to locate the faulty site; 4. Preliminarily set as a single board problem. The correct order of the above four steps is?


 

Leave a Reply

Your email address will not be published. Required fields are marked *